Bridge or road to Sunshine Coast would cost billions

Public asked to comment on possible fixed link to connect Gibsons, Powell River to mainland, replace ferries

One option for a fixed link to the Sunshine Coast would involve building a pair of suspensions bridges spanning Howe Sound at Anvil Island.

Four potential options to build new bridges or roads to create a fixed link to the Sunshine Coast have been short listed by the B.C. government and put out for public comment.

And any one of them would come with a hefty price tag.

The province is exploring the financial and physical feasibility of new routes to shorten the current travel times by ferry to communities like Gibsons, Sechelt and Powell River.

The most direct route from the mainland to the Gibsons area – at a cost estimated at $2 to $2.5 billion – would be a pair of 1.5-kilometre suspension bridges crossing from Brunswick Point on Highway 99 to Anvil Island and then across the rest of the Howe Sound.  That’s estimated to halve the travel time from Horseshoe Bay to Langdale to about 40 minutes from roughly an average of 80 minutes now by ferry.

A cheaper “Langdale Road” route at $1.5 to $2 billion would be to build 58 kilometres of new highway starting north of Squamish and running along the west side of Howe Sound to connect with the end of the Sunshine Coast road at Port Mellon.

The travel time from Horseshoe Bay by that route would be much longer – about 90 minutes – but about 45 minutes from Squamish.

Under both those scenarios the province would eliminate the existing Horseshoe Bay to Langdale ferry, but retain ferry service to Powell River at the other end of the Sunshine Coast.

The Langdale Road would effectively force all traffic to and from the Sunshine Coast to go through Squamish, adding to traffic congestion on busy sections of the Sea-to-Sky Highway.

Also under consideration is a new highway following logging roads where possible on a route from Squamish running northwest, then around the north end of Jervis Inlet and then southwest to Powell River.

The new 200-kilometre highway – costing an estimated $2.5 to $3 billion – would cut the travel time from Horseshoe Bay to Powell River to three hours of driving, down from 4.5 hours now with two ferries. Both current ferry routes would be retained.

Another option for a pair of long suspension bridges connecting Powell River to the rest of the Sunshine Coast via Nelson Island would eliminate just the Saltery Bay-Earls Cove ferry service. It would cost an estimated $1.5 to $2 billion and wouldn’t end the need to take the Langdale ferry.

Other road or bridge alternatives, including a floating bridge or floating tunnel, were examined but did not make the short list.

Feedback is being collected online until Nov. 8 at gov.bc.ca/sunshinecoastfixedlink.

Some Sunshine Coast residents welcome the improved access a fixed link would bring, while others fear a deluge of increased traffic from the Lower Mainland, even though it’s expected any new route would be tolled.

A technical report by an engineering firm is due later this year with more detailed findings on the options.

Four short listed routes.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

MLA in a pandemic, Nanaimo’s Malcolmson looking to be part of B.C.’s recovery

Sheila Malcolmson running for re-election in Nanaimo riding

Best of the City: Greek taverna takes top spot

Asteras in the Old City Quarter chosen Nanaimo’s Best Restaurant Overall

Best of the City: Making a house a home

Dodd’s Furniture, voted Best Furniture Store, settles into new location in Nanaimo

Paul Manly reacts to Liberal throne speech

Manly says the Liberals need to back up their promises with action

Nanaimo parents say elementary schools aren’t appropriate voting stations in a pandemic

Elections B.C. says site of polling stations not yet determined, working with Dr. Henry’s office

B.C. records 98 more COVID-19 cases, most in Lower Mainland

One new senior home outbreak, Surrey Memorial outbreak over

Best of the City: This year’s winners

Nanaimo News Bulletin presents full results of our 2020 Best of the City readers’ survey

Vancouver Island Tour de Rock riders roll into Parksville Qualicum Beach

Saturday’s schedule includes Port Alberni, Ucluelet and Tofino, followed by Nanaimo on Sunday

PHOTOS: 2nd calf in a month confirmed among Southern Resident killer whale pod

Center for Whale Research said they will eagerly await to observe the calf to evaluate its health

2 British Columbians arrested, 3 at large in massive Alberta drug bust

Eight people are facing 33 charges in what police have dubbed Project Incumbent

97 distressed horses, cats and dogs seized from farm in Princeton

RCMP assisted as BC SPCA executed search warrant

Snuneymuxw artist brings aquatic designs to Nanaimo’s Beban Park pool

Work by artist Eliot White-Hill is being installed at the pool this month

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Most Read