Illustration shows new Pattullo Bridge will have four vehicle lanes with a divider and separate lanes for pedestrians and cyclists. (Ministry of Transportation)

Contractors picked for B.C.’s Pattullo Bridge replacement

Acciona, Aecon to build union-only four-lane Fraser crossing

The B.C. government has picked a partnership of construction giants Acciona and Aecon to build the replacement for the aging Pattullo Bridge between Surrey and New Westminster.

Estimated at a cost of $1.377 billion, the new bridge and connecting roads are scheduled to be completed in 2023. Built north of the existing 83-year-old structure, the new bridge will still have only four vehicle lanes, plus pedestrian and bike lanes and a new off-ramp to Highway 17, the South Fraser Perimeter Road.

In a year-end interview with Black Press, Premier John Horgan said the Pattullo crossing is a higher priority than the congested George Massey Tunnel because the Pattullo is “falling into the river.” It is one of three projects designated by the NDP government’s “community benefits agreement” that requires construction workers to be a member of one of 19 mostly U.S.-based unions.

Transportation Minister Claire Trevena has acknowledged that the union-only deal would add about seven per cent to the cost of the project, or nearly $100 million in the case of the Pattullo.

Trevena and Horgan say the new public construction rules will result in more local hiring and use of apprentices. The Independent Contractors and Business Association cites statistics from the government’s Industry Training Authority showing three out of four apprentices are sponsored by open-shop companies, not building trades unions that run their own training facilities.

Acciona is a Spain-based multinational that is also a major contractor on the Site C dam in northern B.C. and the Walterdale Bridge in Edmonton. Its original bid was with a group including SNC Lavalin, but the Quebec-based company dropped out and the successful consortium with Aecon is called Fraser Crossing Partners.

RELATED: Pattullo Bridge seismic work scrapped as ‘cost-prohibitive’

RELATED: OUTLOOK 2020: John Horgan on forestry and union labour

RELATED: Cost jumps 35% for union-only Highway 1 widening job

Aecon Group is a long-established Ontario-based company that is building the Annacis Island wastewater treatment plant in Delta and has contracts for the Coastal GasLink pipeline across northern B.C., as well as refurbishing the John Hart Dam on Vancouver Island and the Darlingon nuclear plant in Ontario.

The Canadian government intervened in 2018 to block the sale of Aecon to China’s CCCI International Holding. Innovation Minister Navdeep Bains said at the time the decision was the result of a “multi-step national security review process.”

In a statement from its Chicago office Friday, Acciona said it and Aecon have been selected as the preferred proponent “to design, construct, and partially finance during construction” the new Pattullo Bridge.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Astronomer discusses search for life in oceans of moons of Jupiter and Saturn

Jon Willis will present at Nanaimo Astronomy Society meeting Jan. 23

Regional District of Nanaimo to consider HandyDart bus fleet replacement

New light-duty, gas-powered buses sought by funding partner B.C. Transit

Ice chunk from truck crushes vehicle windshield near Nanaimo

None injured, but Nanaimo RCMP say fines for accumulations of ice and snow

Nanaimo theft victim confronts suspects with baseball bat

Nanaimo RCMP seek identity of two people alleged to have used a stolen credit card

VIU professor concerned about myths around insect apocalypse

Jasmine Janes’s work published in peer-reviewed journal BioScience

Canada to bolster screening of central China passengers for virus at 3 airports

Additional measures will include messaging on arrivals screens in Toronto, Montreal and Vancouver

Calls for dialogue as Coastal GasLink pipeline polarizes some in northern B.C.

Coastal GasLink is building the 670-kilometre pipeline from British Columbia’s northeast to Kitimat on the coast

Wind and snow spark power outages across Vancouver Island

Winter storm warning in effect for east and west regions while wind warning to hit south and north

BC Ferries hybrid ships arrive in Victoria on Saturday

The battery-operated vessels will take over smaller routes

Closed mills, housing surge support a positive forecast for lumber industries

B.C. lumber producers have closed mills accounting for 18% of province’s capacity, RBC report says

Good Samaritan pays part of rent for B.C. woman facing eviction in can-collecting dispute

Zora Hlevnjak, 76, supplements her pension by collecting cans and receiving public donations

Kelowna’s ‘Baby Mary’ finds biological parents after more than 30 years

Geneologist and DNA test helped her connect with her biological parents

Beefs & Bouquets, Jan. 16

To submit a beef or a bouquet to the Nanaimo News Bulletin, e-mail editor@nanaimobulletin.com

Kelowna hotel to award couples for baby-making with Nooner deal

The deal includes a free stay every Valentine’s Day for the next 18 years

Most Read